VARIO-HAUS building projects

Successfully completed building projects

The business field "commercial construction /B2B" comprises the planning and erection as general contractor of residential areas, semi detached houses, condominiums, kindergartens, office buildings, show rooms and residences for retired people.
 
Here a number of references and some erection data:

exclusive residence "Sonnenheide"

exclusive residence "Sonnenheide",
at the "Akademiepark" in Wiener Neustadt

4 two-level-double houses .

site errection time: 42 weeks
construction site: 585,2 m2
ground floor: 865,2 m2
cubic measurements of the site: 4,681 m3

low energie residence in Ternitz

low energie residence
in Ternitz

4 two-level-double houses with < 18kWh/m²a energy consumption.

site errection time: 30 weeks
construction site: 666,4 m2
ground floor measurement: 922,3 m2
cubic measurements of the site: 8,759 m3

office building for the Coca Cola refilling partner in Vienna

low energie office building
for the Coca Cola refilling partner Hellenic in Vienna

two-level office building.

site errection time: 5 weeks
construction site: 92,5 m2
ground floor: 156 m2
cubic measurements of the site: 648 m3

Doppelhausanlage Sonnendorf, Teesdorf

Semi detached Houses Condominium, Teesdorf
Eight semi detached villas with 16 house units
 
Construction time: 40 weeks
Built-up area: 1,306.38 sqm
Area of floor plans: 1,843.84 sqm
Interior space: 7,048 c um
 

Niedrigenergie-Wohnhausanlage Zwentendorf

Low Energy Residential Area, Zwentendorf
First and second construction period, 5x4 house units
 
Per construction period
Construction time: 36 weeks
Built-up area: 1,327.73 sqm
Area of floor plans: 1,769.84 sqm
Interior space: 8,276 c um

Passiv-Reihenhausanlage, Ital. Dörfchen, Gießhübl

Passive terraced Houses „Italian Village“, Gießhübl
1 x 4 and 3x3 house units
 
Construction time: 36 weeks
Built-up area: 849.50 sqm
Area of floor plans: 1,747.20 sqm
Interior space: 7,652 c um

Passiv-Wohnhausanlage, Wiener Neustadt

Passive Houses Condominium, Wiener Neustadt
First construction period: 5x4 house units
 
Construction time: 36 weeks
Built-up area: 1,228.80 sqm
Area of floor plans: 1,730.90 sqm
Interior space: 6,800 c um

Passive Houses Condominium, Wiener Neustadt
Second construction period: 3x4 house units
 
Construction time: 36 weeks
Built-up area: 737.28 sqm
Area of floor plans: 1,038.50 sqm
Interior space: 4,060 c um

Mehrgeschossige Wohnhausanlage, Wien 22

Multi-Storey Condominium, Wien 22
Three blocks with 8 house units each
 
Construction time: 48 weeks
Built-up area: 1,066.66 sqm
Area of floor plans: 2,098.80 sqm
Interior space: 9,332 c um

Dienstleistungszentrum, Teesdorf

Service Centre, Teesdorf
Pharmacy, offices, medical practises, coffee shop and shops
 
Construction time: 27 weeks
Built-up area: 416.53 sqm
Area of floor plans: 713.25 sqm

Ärztezentrum, Oberpullendorf

Medical Centre, Oberpullendorf
Multifunctional residential and office building: Ground floor solid construction; first and second floor medical practises, top floor apartment, all system VARIO-BAU
 
Construction time: 30 weeks
Built-up area: 402.26 sqm
Area of floor plans: floors 1-3: 577.60 sqm

Wohn- und Bürogebäude, Neusiedl

Residential and Office Building, Neusiedl
Multifunctional residential and office building; Ground, first and second floor solid construction, third, forth and fifth floor sytem VARIO-BAU
 
Construction time: 14 weeks
Built-up area: 577.60 sqm
Area of floor plans: floors 3-5: 577.60 sqm

Bürogebäude, Wiener Neustadt

Office Building, Wiener Neustadt
Office building and design centre
 
Construction time: 18 and 14 weeks
Built-up area: 726 and 390 sqm = 1,116 sqm
Area of floor plans: 603 and 375 sqm = 978 sqm

Wohnanlage, Wiener Neustadt

Terraced Houses, Wiener Neustadt
Five semi detached homes with two floors each
 
Construction time: 16 weeks
Built-up area: 482 sqm
Area of floor plans: 1,054 sqm
Interior space: 3,879 c um

Wohnanlage Sieghartskirchen

Condominium, Sieghartskirchen
Two x four terraced house with two floors each
 
Construction time: 20 weeks
Built-up area: 756 sqm
Area of floor plans: 1,916 sqm
Interior space: 6,352 c um

Kindergarten ORF, Wien 13

Kindergarten ORF, Wien 13
For three groups
 
Construction time: 4 weeks
Built-up area: 172 sqm
Area of floor plans: 153 sqm
Interior space: 670 c um

Kindergarten, Wiener Neustadt

Kindergarten, Wiener Neustadt
For three groups
 
Construction time: 5 weeks
Built-up area: 468 sqm
Area of floor plans: 407 sqm
Interior space: 2,770 c um

Messebüro, Wiener Neustadt

Exhibition Office, Wiener Neustadt
Office building with counter hall
 
Construction time: 5 weeks
Built-up area: 177 sqm
Area of floor plans: 151 sqm
Interior space: 781 c um

Our website is optimized for Internet Explorer 7.0+ and a screen resolution of 1280 x 1024.